 |
| |
| 31 July 2006 |
| |
| Additional Boarding gates were required at the airport due to passenger demand.We installed over 1000m2 of 300x300mm terrazzo floor tiles to match existing.Most of the work was completed at night |
| |
| Material/s Used: Terrazzo Tiles |
| |
| Project Images: |
|
|